TC 18 FD
DIAMOND COACH CORPORATION
|
Date | 1994-10-18 |
---|---|
Personnel | B.L., & N.E. |
Temperature (°F) | 68 |
Humidity (%) | 58 |
Wind Direction | NW |
Wind Speed (MPH) | 2 |
Barometer (in.Hg) | 30.1 |
Test Results
Inspect tow equipment-bus interface | A safe and adequate connection was made between the tow equipment and the bus. |
---|---|
Inspect tow equipment-wrecker interface | A safe and adequate connection was made between the tow equipment (chains) and the wrecker. |
Towing Comments | The front bumper was removed, as well as the windshield washer reservoir, in order to tow from the front axle. Two tow chains (2) were attached to the front axle, then to the wrecker. A 4" x 4" and a 6" x 8" wooden beam were used. |
Description and location of any structural damage | |
General Comments | Bus was not equipped with tow eyes, or hooks. Wooden beams were placed under the frame and at the front, below the spring shackle. |
General
Check-In
Back to Bus List
- Summary
- Weight
- Clearances
- Body Details
- Engine
- Transmission
- Suspension
- Wheels & Tires
- Brakes
- HVAC
- Steering
- Capacities
- Misc.
- Components
- Spare Parts
- Integrity Summary
- Shakedown
- Distortion Summary
- Distortion Test
- Static Towing Summary
- Static Towing Test
- Dynamic Towing Summary
- Dynamic Towing Test
- Jacking Summary
- Jacking Test
- Hoisting Summary
- Hoisting Test
- Durability Summary
- Durability Mileage
- Unscheduled Maintenance
- Interior Summary
- Stationary Test
- Acceleration Test
- Vibration Test
- Exterior Summary
- Constant Acceleration
- Standstill Acceleration
- Stationary
Back to Bus List