CD-291

CHAMPION BUS INC.

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1994-08-28 Temperature: 65
Personnel: B.R., D.O., & N.E. Test Load (lbs): 15750
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.026 -0.026 -0.014 -0.014
2 0.000 0.090 0.090 0.008 0.008
3 0.000 0.140 0.140 0.015 0.015
4 0.000 0.072 0.072 0.009 0.009
5 0.000 0.523 0.523 0.136 0.136
6 0.000 0.995 0.995 0.223 0.223
7 0.000 0.964 0.964 0.169 0.169
8 0.000 0.504 0.504 0.128 0.128
9 0.000 0.028 0.028 0.001 0.001
10 0.000 0.076 0.076 0.000 0.000
11 0.000 0.044 0.044 0.002 0.002
12 0.000 -0.021 -0.021 -0.008 -0.008

Loading Sequence: 1

Date: 1994-08-28 Temperature: 65
Personnel: B.R., D.O., & N.E. Test Load (lbs): 15750
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.014 -0.026 -0.012 -0.009 0.005
2 0.008 0.099 0.091 0.012 0.004
3 0.015 0.156 0.141 0.019 0.004
4 0.009 0.078 0.069 0.011 0.002
5 0.136 0.537 0.401 0.141 0.005
6 0.223 0.998 0.775 0.228 0.005
7 0.169 0.942 0.773 0.164 -0.005
8 0.128 0.509 0.381 0.134 0.006
9 0.001 0.029 0.028 0.001 0.000
10 0.000 0.079 0.079 0.001 0.001
11 0.002 0.047 0.045 0.002 0.000
12 -0.008 -0.022 -0.014 -0.007 0.001