CD-291

CHAMPION BUS INC.

Dynamic Towing Test Data Form

Date 1994-12-16
Personnel B.L. & R.H.
Temperature (°F) 34
Humidity (%) 80
Wind Direction S
Wind Speed (MPH) 9
Barometer (in.Hg) 30.38

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made.
Inspect tow equipment-wrecker interface A safe and adequate connection was made.
Towing Comments Tow chains were connected to each side of the axle. A lift tow was performed with a 4x4 wooden beam placed unde the front bumper to pervent damage.
Description and location of any structural damage None noted
General Comments No problems were encountered during the test.