Structural Shakedown Data Form

Loading Sequence: 1

Date: 1994-11-04 Temperature: 70
Personnel: B.L., B.R., S.C., N.E., J.P., & D.F. Test Load (lbs): 13125
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.020 -0.020 0.026 0.026
2 0.000 0.255 0.255 0.060 0.060
3 0.000 0.386 0.386 0.078 0.078
4 0.000 0.394 0.394 0.081 0.081
5 0.000 0.275 0.275 0.067 0.067
6 0.000 0.060 0.060 0.012 0.012
7 0.000 0.043 0.043 0.002 0.002
8 0.000 0.277 0.277 0.079 0.079
9 0.000 0.365 0.365 0.088 0.088
10 0.000 0.342 0.342 0.083 0.083
11 0.000 0.225 0.225 0.058 0.058
12 0.000 -0.004 -0.004 0.000 0.000

Loading Sequence: 1

Date: 1994-11-04 Temperature: 70
Personnel: B.L., B.R., S.C., N.E., J.P., & D.F. Test Load (lbs): 13125
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.026 -0.020 -0.046 0.026 0.000
2 0.060 0.258 0.198 0.058 -0.002
3 0.078 0.390 0.312 0.076 -0.002
4 0.081 0.398 0.317 0.080 -0.001
5 0.067 0.277 0.210 0.066 -0.001
6 0.012 0.061 0.049 0.012 0.000
7 0.002 0.044 0.042 0.004 0.002
8 0.079 0.280 0.201 0.080 0.001
9 0.088 0.369 0.281 0.090 0.002
10 0.083 0.345 0.262 0.084 0.001
11 0.058 0.228 0.170 0.059 0.001
12 0.000 -0.003 -0.003 -0.001 -0.001