BB365

THOMAS BUILT

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1995-01-06 Temperature: 68
Personnel: B.L., B.R., S.C., & D.F. Test Load (lbs): 9075
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.003 0.003 0.000 0.000
2 0.000 0.055 0.055 0.009 0.009
3 0.000 0.074 0.074 0.011 0.011
4 0.000 0.053 0.053 0.008 0.008
5 0.000 0.040 0.040 -0.004 -0.004
6 0.000 0.058 0.058 -0.009 -0.009
7 0.000 0.034 0.034 0.003 0.003
8 0.000 0.024 0.024 0.008 0.008
9 0.000 0.056 0.056 0.033 0.033
10 0.000 0.065 0.065 0.032 0.032
11 0.000 0.047 0.047 0.020 0.020
12 0.000 0.002 0.002 0.002 0.002

Loading Sequence: 1

Date: 1995-01-06 Temperature: 68
Personnel: B.L., B.R., S.C., & D.F. Test Load (lbs): 9075
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.002 0.002 0.000 0.000
2 0.009 0.055 0.046 0.010 0.001
3 0.011 0.073 0.062 0.012 0.001
4 0.008 0.052 0.044 0.008 0.000
5 -0.004 0.040 0.044 -0.004 0.000
6 -0.009 0.059 0.068 -0.009 0.000
7 0.003 0.036 0.033 0.004 0.001
8 0.008 0.020 0.012 0.009 0.001
9 0.033 0.057 0.024 0.034 0.001
10 0.032 0.065 0.033 0.035 0.003
11 0.020 0.047 0.027 0.022 0.002
12 0.002 0.003 0.001 0.002 0.000