TC40102N

NOVA BUS

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1995-01-30 Temperature: 70
Personnel: B.L., B.R., S.C., J.P., G.F., and N.E. Test Load (lbs): 29250
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.078 0.078 0.021 0.021
2 0.000 0.115 0.115 0.032 0.032
3 0.000 0.224 0.224 0.041 0.041
4 0.000 0.263 0.263 0.061 0.061
5 0.000 0.241 0.241 0.054 0.054
6 0.000 0.156 0.156 0.066 0.066
7 0.000 0.056 0.056 0.015 0.015
8 0.000 0.125 0.125 0.010 0.010
9 0.000 0.178 0.178 0.015 0.015
10 0.000 0.140 0.140 0.006 0.006
11 0.000 0.084 0.084 0.005 0.005
12 0.000 0.032 0.032 0.004 0.004

Loading Sequence: 1

Date: 1995-01-30 Temperature: 70
Personnel: B.L., B.R., S.C., J.P., G.F., and N.E. Test Load (lbs): 29250
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.021 0.080 0.059 0.023 0.002
2 0.032 0.157 0.125 0.034 0.002
3 0.041 0.231 0.190 0.043 0.002
4 0.061 0.273 0.212 0.062 0.001
5 0.054 0.250 0.196 0.057 0.003
6 0.066 0.167 0.101 0.070 0.004
7 0.015 0.056 0.041 0.018 0.003
8 0.010 0.124 0.114 0.010 0.000
9 0.015 0.085 0.070 0.016 0.001
10 0.006 0.143 0.137 0.006 0.000
11 0.005 0.085 0.080 0.006 0.001
12 0.004 0.032 0.028 0.005 0.001