TC40102N

NOVA BUS

Dynamic Towing Test Data Form

Date 1995-09-14
Personnel B.L., S.C. and R.H.
Temperature (°F) 68
Humidity (%) 68
Wind Direction nw
Wind Speed (MPH) 7
Barometer (in.Hg) 29.98

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the two equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments Clevises were attached to each front tow eye. A chain was attached to each clevis, then to the test center's tow bar. A lift tow was then performed with no difficulty or damage observed.
Description and location of any structural damage
General Comments None