Structural Shakedown Data Form

Loading Sequence: 1

Date: 1995-02-28 Temperature: 70
Personnel: B.L., B.R., S.C., N.E., and D.F. Test Load (lbs): 1875
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.007 -0.007 -0.002 -0.002
2 0.000 0.014 0.014 0.001 0.001
3 0.000 0.028 0.028 0.002 0.002
4 0.000 0.020 0.020 0.001 0.001
5 0.000 0.003 0.003 0.001 0.001
6 0.000 0.034 0.034 0.004 0.004
7 0.000 0.048 0.048 0.005 0.005
8 0.000 0.002 0.002 0.001 0.001
9 0.000 0.030 0.030 0.003 0.003
10 0.000 0.047 0.047 0.005 0.005
11 0.000 0.022 0.022 0.005 0.005
12 0.000 -0.020 -0.020 0.001 0.001

Loading Sequence: 1

Date: 1995-02-28 Temperature: 70
Personnel: B.L., B.R., S.C., N.E., and D.F. Test Load (lbs): 1875
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.002 -0.007 -0.005 -0.002 0.000
2 0.001 0.014 0.013 0.002 0.001
3 0.002 0.028 0.026 0.003 0.001
4 0.001 0.021 0.020 0.002 0.001
5 0.001 0.003 0.002 0.002 0.001
6 0.004 0.035 0.031 0.002 -0.002
7 0.005 0.049 0.044 0.006 0.001
8 0.001 0.003 0.002 0.001 0.000
9 0.003 0.031 0.028 0.004 0.001
10 0.005 0.049 0.044 0.006 0.001
11 0.005 0.025 0.020 0.007 0.002
12 0.001 -0.019 -0.020 0.005 0.004