D40 INVERO

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2002-06-13
Personnel S.C.
Temperature (°F) 72
Humidity (%) 88
Wind Direction SW
Wind Speed (MPH) 6
Barometer (in.Hg) 29.83

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the test bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating a hydraulic under lift.
Description and location of any structural damage
General Comments The manufacturer does not recommend rear towing.