TB-2242
CHAMPION MOTOR COACH, INC.
|
Date: | 1996-08-23 |
Personnel: | S.C., J.P., & G.F. |
Temperature: | 80 |
Inspect right front tow eye and adjoining structure. |
---|
Comments: All welds verified. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: No damage or deformation. |
Inspect left front tow eye and adjoining structure. |
Comments: |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: |
Inspect right rear tow eye and adjoining structure. |
Comments: All welds verified. |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: No damage or deformation. |
Inspect left rear tow eye and adjoining structure. |
Comments: |
Check the torque of all bolts attaching tow eye and surrounding structure. |
Comments: |
General comments of any other structure deformation or failure: |
No damage or deformation was noted during testing. The NBM was not equipped for rear towing, 20 degree up pull was not performed. The angle could not be obtained due to the location of the tow hooks. |
General
Check-In
Back to Bus List
- Summary
- Weight
- Clearances
- Body Details
- Engine
- Transmission
- Suspension
- Wheels & Tires
- Brakes
- HVAC
- Steering
- Capacities
- Misc.
- Components
- Spare Parts
- Integrity Summary
- Shakedown
- Distortion Summary
- Distortion Test
- Static Towing Summary
- Static Towing Test
- Dynamic Towing Summary
- Dynamic Towing Test
- Jacking Summary
- Jacking Test
- Hoisting Summary
- Hoisting Test
- Durability Summary
- Durability Mileage
- Unscheduled Maintenance
- Interior Summary
- Stationary Test
- Acceleration Test
- Vibration Test
- Exterior Summary
- Constant Acceleration
- Standstill Acceleration
- Stationary
Back to Bus List