CONTENDER TB-2242

CHAMPION MOTOR COACH, INC. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1996-02-27 Temperature: 70
Personnel: B.L., S.C., D.F., & K.D. Test Load (lbs): 15000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.002 0.002 0.007 0.007
2 0.000 0.074 0.074 0.013 0.013
3 0.000 0.091 0.091 0.013 0.013
4 0.000 0.101 0.101 0.014 0.014
5 0.000 0.112 0.112 0.014 0.014
6 0.000 0.135 0.135 0.013 0.013
7 0.000 0.116 0.116 0.016 0.016
8 0.000 0.810 0.810 0.015 0.015
9 0.000 0.075 0.075 0.011 0.011
10 0.000 0.065 0.065 0.010 0.010
11 0.000 0.051 0.051 0.009 0.009
12 0.000 -0.004 -0.004 0.005 0.005

Loading Sequence: 1

Date: 1996-02-27 Temperature: 70
Personnel: B.L., S.C., D.F., & K.D. Test Load (lbs): 15000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.007 0.005 -0.002 0.007 0.000
2 0.013 0.078 0.065 0.014 0.001
3 0.013 0.095 0.082 0.015 0.002
4 0.014 0.106 0.092 0.015 0.001
5 0.014 0.117 0.103 0.016 0.002
6 0.013 0.137 0.124 15.000 14.987
7 0.016 0.110 0.094 0.018 0.002
8 0.015 0.078 0.063 0.016 0.001
9 0.011 0.075 0.064 0.012 0.001
10 0.010 0.067 0.057 0.012 0.002
11 0.009 0.053 0.044 0.010 0.001
12 0.005 0.002 -0.003 0.006 0.001