XB20RD

DOUBLE K INC. Pdf Download PDF Report

Static Towing Test Data Form

Date: 1996-07-01
Personnel: B.L., & S.C.
Temperature: 85

 

Inspect right front tow eye and adjoining structure.
Comments: Tow hook and connecting bracket were welded.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: A safe and adequate connection was made.
Inspect left front tow eye and adjoining structure.
Comments:
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: A safe and adequate connectio was made.
Inspect right rear tow eye and adjoining structure.
Comments: Tow hook and connection bracket were welded.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: A safe and adequate connection was made.
Inspect left rear tow eye and adjoining structure.
Comments: A safe and adequate connection was made.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: Tow hook and connecting bracket were welded.
General comments of any other structure deformation or failure:
A test weight of 19320 lbs was used during this test. The front axle was used to tie down during the front tow, and rear axle for rear tow. There was no structure deformation of failure noted during any portion of the test.