LOW

Freedom One - Supreme Corp. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1996-06-04
Personnel B.L.
Temperature (°F) 75
Humidity (%) 48
Wind Direction NW
Wind Speed (MPH) 5
Barometer (in.Hg) 30.03

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed by use of a wheel cradle apparatus.
Description and location of any structural damage None noted
General Comments None noted