TCD 9679629-1

MID BUS, INC. Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1996-04-30 Temperature: 70
Personnel: B.L., S.C., D.F., J.P., & G.F. Test Load (lbs): 10725
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.010 -0.010 0.000 0.000
2 0.000 0.038 0.038 0.026 0.026
3 0.000 0.071 0.071 0.000 0.000
4 0.000 0.102 0.102 0.020 0.020
5 0.000 0.046 0.046 0.011 0.011
6 0.000 0.024 0.024 0.005 0.005
7 0.000 0.004 0.004 0.001 0.001
8 0.000 0.028 0.028 0.005 0.005
9 0.000 0.005 0.005 0.003 0.003
10 0.000 0.004 0.004 0.005 0.005
11 0.000 0.038 0.038 0.008 0.008
12 0.000 -0.012 -0.012 0.000 0.000

Loading Sequence: 1

Date: 1996-04-30 Temperature: 70
Personnel: B.L., S.C., D.F., J.P., & G.F. Test Load (lbs): 10725
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.010 -0.010 0.000 0.000
2 0.026 0.045 0.019 0.029 0.003
3 0.000 0.076 0.076 0.000 0.000
4 0.020 0.105 0.085 0.022 0.002
5 0.011 0.047 0.036 0.011 0.000
6 0.005 0.025 0.020 0.005 0.000
7 0.001 0.005 0.004 0.001 0.000
8 0.005 0.030 0.025 0.006 0.001
9 0.003 0.009 0.006 0.004 0.001
10 0.005 0.008 0.003 0.005 0.000
11 0.008 0.048 0.040 0.009 0.001
12 0.000 -0.012 -0.012 0.000 0.000