TCD 9679629-1

MID BUS, INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1996-06-21
Personnel K.D.
Temperature (°F) 80
Humidity (%) 45
Wind Direction SW
Wind Speed (MPH) 2
Barometer (in.Hg) 30.07

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front wheel lift was performed with no problems encountered.
Description and location of any structural damage None noted
General Comments A front wheel lift was performed with the drive shaft disconnected.