QBRE CNG

BLUE BIRD CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1996-11-22
Personnel B.L., R.H. & B.B.
Temperature (°F) 49
Humidity (%) 69
Wind Direction NW
Wind Speed (MPH) 9
Barometer (in.Hg) 29.96

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment (chains) and the wrecker.
Towing Comments A flat tow was performed on the front and a lift tow performed on the back. A front lift tow could not be performed due to the construction of the bumper.
Description and location of any structural damage
General Comments A driver was incorporated during both tests to assist in steering.