QBRE CNG

BLUE BIRD CORPORATION Pdf Download PDF Report

Static Towing Test Data Form

Date: 1996-12-12
Personnel: S.C., G.F.,& D.F.
Temperature: 40

 

Inspect right front tow eye and adjoining structure.
Comments: All torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect left front tow eye and adjoining structure.
Comments: All torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: Rear main frame rails deformed upward during the 20 degree up pull.
Inspect right rear tow eye and adjoining structure.
Comments: all torques verified.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: No damage or deformation.
Inspect left rear tow eye and adjoining structure.
Comments: Rear main frame rails deformed upward during the 20 degree up pull.
Check the torque of all bolts attaching tow eye and surrounding structure.
Comments: All torques verified.
General comments of any other structure deformation or failure:
All four front tows were completed wigh no deformation, damage or problems noted. Rear testing was terminated after the 20 degree up pull due to deformation of both main frame rails.