6.501

ORION BUS INDUSTRIES Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1996-07-25 Temperature: 74
Personnel: B.L., D.F., & K.D. Test Load (lbs): 24000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.017 0.017 0.007 0.007
2 0.000 0.095 0.095 0.011 0.011
3 0.000 0.156 0.156 0.012 0.012
4 0.000 0.178 0.178 0.012 0.012
5 0.000 0.101 0.101 0.009 0.009
6 0.000 0.012 0.012 0.009 0.009
7 0.000 0.006 0.006 0.004 0.004
8 0.000 0.058 0.058 0.009 0.009
9 0.000 0.143 0.143 0.012 0.012
10 0.000 0.131 0.131 0.011 0.011
11 0.000 0.083 0.083 0.009 0.009
12 0.000 0.008 0.008 0.007 0.007

Loading Sequence: 1

Date: 1996-07-25 Temperature: 74
Personnel: B.L., D.F., & K.D. Test Load (lbs): 24000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.007 0.016 0.009 0.007 0.000
2 0.011 0.098 0.087 0.014 0.003
3 0.012 0.160 0.148 0.015 0.003
4 0.012 0.185 0.173 0.015 0.003
5 0.009 0.106 0.097 0.012 0.003
6 0.009 0.016 0.007 0.007 -0.002
7 0.004 0.005 0.001 0.001 -0.003
8 0.009 0.061 0.052 0.009 0.000
9 0.012 0.161 0.149 0.012 0.000
10 0.011 0.137 0.126 0.012 0.001
11 0.009 0.088 0.079 0.010 0.001
12 0.007 0.007 0.000 0.005 -0.002