SENTRY 1350-4565

GOSHEN COACH Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1996-11-21
Personnel B.L., S.C., & R.H.
Temperature (°F) 45
Humidity (%) 58
Wind Direction N
Wind Speed (MPH) 6
Barometer (in.Hg) 30.09

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment (chains) and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment (chains) and the wrecker.
Towing Comments A front flat tow was performed with no problem encountered during the tow or with the towing interface.
Description and location of any structural damage
General Comments A driver was incorporated during the test to assist in steering.