CSTS

BLUE BIRD CORPORATION Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1996-08-29 Temperature: 80
Personnel: B.L., S.C., J.P., & G.F. Test Load (lbs): 12000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.025 -0.025 -0.003 -0.003
2 0.000 0.129 0.129 0.023 0.023
3 0.000 0.129 0.129 0.020 0.020
4 0.000 0.123 0.123 0.022 0.022
5 0.000 0.082 0.082 0.017 0.017
6 0.000 0.032 0.032 -0.002 -0.002
7 0.000 0.018 0.018 -0.004 -0.004
8 0.000 0.078 0.078 0.024 0.024
9 0.000 0.105 0.105 0.017 0.017
10 0.000 0.114 0.114 0.019 0.019
11 0.000 0.406 0.406 0.018 0.018
12 0.000 -0.043 -0.043 -0.009 -0.009

Loading Sequence: 1

Date: 1996-08-29 Temperature: 80
Personnel: B.L., S.C., J.P., & G.F. Test Load (lbs): 12000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.003 -0.023 -0.020 -0.003 0.000
2 0.023 0.132 0.109 0.023 0.000
3 0.020 0.135 0.115 0.023 0.003
4 0.022 0.126 0.104 0.230 0.208
5 0.017 0.086 0.069 0.018 0.001
6 -0.002 0.029 0.031 0.000 0.002
7 -0.004 0.017 0.021 -0.004 0.000
8 0.024 0.079 0.055 0.025 0.001
9 0.017 0.108 0.091 0.018 0.001
10 0.019 0.118 0.099 0.020 0.001
11 0.018 0.112 0.094 0.020 0.002
12 -0.009 -0.040 -0.031 -0.009 0.000