CSTS

BLUE BIRD CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1997-01-21
Personnel B.L., S.C., & B.B.
Temperature (°F) 46
Humidity (%) 60
Wind Direction N
Wind Speed (MPH) 5
Barometer (in.Hg) 30.0

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments The test bus was not equipped with any tow eyes or tow hooks. Chains were attached to the front axle and a front lift tow was performed.
Description and location of any structural damage
General Comments