LFS-TC4010 2N

NOVA BUS Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1996-06-11
Personnel B.L., S.C., & R.H.
Temperature (°F) 73
Humidity (%) 57
Wind Direction N
Wind Speed (MPH) 5
Barometer (in.Hg) 30.07

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus. (Tow bar).
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A tow bar was incorporated as the towing interface. A front flat tow was performed with no problems observed. The tow was completed with no damage or deformation.
Description and location of any structural damage
General Comments The manufacturer does not recommend rear towing.