BSGP 25' S09101

SUPREME CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1997-03-20
Personnel B.L, S.C. and R.H.
Temperature (°F) 37
Humidity (%) 68
Wind Direction n
Wind Speed (MPH) 6
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the two equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front flat tow was performed without incident.
Description and location of any structural damage None noted.
General Comments A driver was incorporated during the test to assist in steering.