SENTRY

GOSHEN COACH Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1997-05-15 Temperature: 65
Personnel: K.D., B.L., and S.C. Test Load (lbs): 12000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.048 0.048 0.034 0.034
2 0.000 0.181 0.181 0.030 0.030
3 0.000 0.192 0.192 0.035 0.035
4 0.000 0.186 0.186 0.040 0.040
5 0.000 0.041 0.041 0.032 0.032
6 0.000 0.383 0.383 0.069 0.069
7 0.000 0.286 0.286 0.052 0.052
8 0.000 0.083 0.083 0.022 0.022
9 0.000 0.045 0.045 0.006 0.006
10 0.000 0.049 0.049 0.008 0.008
11 0.000 0.051 0.051 0.010 0.010
12 0.000 -0.021 -0.021 0.004 0.004

Loading Sequence: 1

Date: 1997-05-15 Temperature: 65
Personnel: K.D., B.L., and S.C. Test Load (lbs): 12000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.034 0.049 0.015 0.038 0.004
2 0.030 0.177 0.147 0.034 0.004
3 0.035 0.189 0.154 0.038 0.003
4 0.040 0.182 0.142 0.044 0.004
5 0.032 0.146 0.114 0.036 0.004
6 0.069 0.395 0.326 0.072 0.003
7 0.052 0.298 0.246 0.055 0.003
8 0.022 0.087 0.065 0.027 0.005
9 0.006 0.037 0.031 0.007 0.001
10 0.008 0.048 0.040 0.010 0.002
11 0.010 0.049 0.039 0.012 0.002
12 0.004 -0.023 -0.027 0.004 0.000