D60LF

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1998-08-26
Personnel S.C., E.L., and R.H.
Temperature (°F) 79
Humidity (%) 56
Wind Direction SW
Wind Speed (MPH) 5
Barometer (in.Hg) 30.12

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed. A steel pin was placed through the tow eyes and the towing apparatus chained to the pin.
Description and location of any structural damage Note noted.
General Comments No problems were noted with the towing apparatus.