AEROTECH 240

ELDORADO NATIONAL Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1998-06-03
Personnel B.L. & R.H.
Temperature (°F) 49
Humidity (%) 57
Wind Direction NW
Wind Speed (MPH) 8
Barometer (in.Hg) 29.87

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow and equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment (chains) and the wrecker.
Towing Comments A front lift tow was performed by chaining to the frame.
Description and location of any structural damage
General Comments