Cassic 28" Raised Roof

METROTRANS CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1998-07-24
Personnel S.C. and E.L.
Temperature (°F) 78
Humidity (%) 63
Wind Direction S.W.
Wind Speed (MPH) 3
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments No Problems.
Description and location of any structural damage Note noted.
General Comments Bus was not equipped with tow eyes, or hooks. Wooden beams were placed under the frame.