102D3

MOTOR COACH INDUSTRIES Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1998-06-16 Temperature: 78
Personnel: B.L., S.C., E.L., M.C., and G.F. Test Load (lbs): 28125
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.034 -0.034 -0.002 -0.002
2 0.000 0.094 0.094 0.045 0.045
3 0.000 0.184 0.184 0.016 0.016
4 0.000 0.217 0.217 0.021 0.021
5 0.000 0.173 0.173 0.017 0.017
6 0.000 0.010 0.010 0.011 0.011
7 0.000 0.006 0.006 0.015 0.015
8 0.000 0.189 0.189 0.022 0.022
9 0.000 0.262 0.262 0.031 0.031
10 0.000 0.235 0.235 0.029 0.029
11 0.000 0.101 0.101 0.013 0.013
12 0.000 -0.036 -0.036 -0.002 -0.002

Loading Sequence: 1

Date: 1998-06-16 Temperature: 78
Personnel: B.L., S.C., E.L., M.C., and G.F. Test Load (lbs): 28125
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 -0.002 -0.036 -0.034 -0.005 -0.003
2 0.015 0.084 0.069 0.017 0.002
3 0.016 0.190 0.174 0.020 0.004
4 0.021 0.221 0.200 0.025 0.004
5 0.017 0.175 0.158 0.020 0.003
6 0.011 0.012 0.001 0.008 -0.003
7 0.015 0.008 -0.007 0.012 -0.003
8 0.022 0.190 0.168 0.026 0.004
9 0.031 0.261 0.230 0.036 0.005
10 0.029 0.241 0.212 0.033 0.004
11 0.013 0.105 0.092 0.015 0.002
12 -0.002 -0.040 -0.038 -0.005 -0.003