Loading Sequence: 1

Date: 1998-08-25 Temperature: 82
Personnel: B.L., S.C., J.P., G.F., E.L. and M.L. Test Load (lbs): 15600
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 0.012 0.012 0.019 0.019
2 0.000 0.055 0.055 0.007 0.007
3 0.000 0.070 0.070 0.005 0.005
4 0.000 0.072 0.072 0.005 0.005
5 0.000 0.042 0.042 0.005 0.005
6 0.000 0.086 0.086 0.008 0.008
7 0.000 0.065 0.065 0.007 0.007
8 0.000 0.040 0.040 0.005 0.005
9 0.000 0.055 0.055 0.008 0.008
10 0.000 0.060 0.060 0.016 0.016
11 0.000 0.034 0.034 0.012 0.012
12 0.000 -0.010 -0.010 0.019 0.019

Loading Sequence: 1

Date: 1998-08-25 Temperature: 82
Personnel: B.L., S.C., J.P., G.F., E.L. and M.L. Test Load (lbs): 15600
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.019 0.018 -0.001 0.021 0.002
2 0.007 0.056 0.049 0.008 0.001
3 0.005 0.071 0.066 0.005 0.000
4 0.005 0.072 0.067 0.006 0.001
5 0.005 0.041 0.036 0.006 0.001
6 0.008 0.085 0.077 0.008 0.000
7 0.007 0.071 0.064 0.010 0.003
8 0.005 0.043 0.038 0.006 0.001
9 0.008 0.061 0.053 0.008 0.000
10 0.016 0.069 0.053 0.017 0.001
11 0.012 0.047 0.035 0.014 0.002
12 0.019 0.002 -0.017 0.021 0.002