MVP-EF

THOMAS BUILT Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1999-04-09
Personnel B.L., S.C. and R.H.
Temperature (°F) 48
Humidity (%) 100
Wind Direction N
Wind Speed (MPH) 5
Barometer (in.Hg) 29.95

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment (chains) and the wrecker.
Towing Comments A front tow was performed
Description and location of any structural damage
General Comments The manufacturer does not recommend rear towing.