D45 Viking

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1999-03-26
Personnel B.L., S.C. and R.H.
Temperature (°F) 40
Humidity (%) 55
Wind Direction Calm
Wind Speed (MPH) Calm
Barometer (in.Hg) 30.1

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments No Problems.
Description and location of any structural damage Note noted.
General Comments