DEFENDER

CHAMPION BUS INC. Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1999-03-18
Personnel B.L., S.C. & R.H.
Temperature (°F) 43
Humidity (%) 48
Wind Direction NW
Wind Speed (MPH) 10
Barometer (in.Hg) 29.89

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made using chains from the axle.
Inspect tow equipment-wrecker interface A safe and adequate connection was made by chaining to the tow bar.
Towing Comments A front lift tow was performed using a 4x4 beam under the frame to clear the radiator and hydraulic lines.
Description and location of any structural damage
General Comments No damage or deformation and no problem with the towing interface was observed during testing.