Classic Trolley BSTR31

SUPREME CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1999-04-21
Personnel B.L., S.C. and R.H.
Temperature (°F) 49
Humidity (%) 52
Wind Direction SW
Wind Speed (MPH) 4
Barometer (in.Hg) 30.04

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed.
Description and location of any structural damage Note noted.
General Comments Front bumper (cow catcher) removed to acquire the towing interface.