F-53

MOLLY CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1999-05-07
Personnel B.L.
Temperature (°F) 69
Humidity (%) 65
Wind Direction Calm
Wind Speed (MPH) Calm
Barometer (in.Hg) 30.03

Test Results

Inspect tow equipment-bus interface Wheels were locked into position with wheel lift.
Inspect tow equipment-wrecker interface Tow vehicle lift connection is adequate.
Towing Comments A front lift tow was performed using a wheel dolly under lift.
Description and location of any structural damage Note noted.
General Comments