Sentinel

GOSHEN COACH Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1999-06-10
Personnel B.L. and B.C.
Temperature (°F) 72
Humidity (%) 40
Wind Direction Calm
Wind Speed (MPH) Calm
Barometer (in.Hg) 29.98

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus by chaining the tow bar to the axle.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front tow lift was performed.
Description and location of any structural damage Note noted.
General Comments A front tow lift was performed. No problems with the towing interface was encountered during testing.