MSV

Advanced Bus Industries Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1999-04-14 Temperature: 65
Personnel: K.D., J.P. and G.F. Test Load (lbs): 6375
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.001 0.124 0.123 0.097 0.096
2 0.000 0.026 0.026 0.000 0.000
3 0.000 0.050 0.050 0.002 0.002
4 0.000 0.040 0.040 0.000 0.000
5 0.000 0.044 0.044 0.003 0.003
6 0.001 0.057 0.056 0.105 0.104
7 0.001 0.068 0.067 0.114 0.113
8 0.000 0.059 0.059 0.020 0.020
9 0.000 0.072 0.072 0.017 0.017
10 0.000 0.030 0.030 0.009 0.009
11 0.000 0.008 0.008 0.010 0.010
12 0.001 0.121 0.120 0.103 0.102

Loading Sequence: 1

Date: 1999-04-14 Temperature: 65
Personnel: K.D., J.P. and G.F. Test Load (lbs): 6375
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.097 0.135 0.038 0.095 -0.002
2 0.000 0.028 0.028 0.001 0.001
3 0.002 0.051 0.049 0.002 0.000
4 0.000 0.041 0.041 0.001 0.001
5 0.003 0.044 0.041 0.003 0.000
6 0.105 0.050 -0.055 0.106 0.001
7 0.114 0.060 -0.054 0.114 0.000
8 0.020 0.014 -0.006 0.020 0.000
9 0.017 0.085 0.068 0.017 0.000
10 0.009 0.031 0.022 0.009 0.000
11 0.010 0.006 -0.004 0.013 0.003
12 0.103 0.130 0.027 0.104 0.001