Universal

GLAVAL BUS Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1999-07-09
Personnel B.L. and R.H.
Temperature (°F) 80
Humidity (%) 42
Wind Direction NNW
Wind Speed (MPH) 6
Barometer (in.Hg) 30.09

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed by chaining to the front axle.
Description and location of any structural damage Note noted.
General Comments Manufacturer does not recommend towing from the rear.