XB Freightliner

MOLLY CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1999-11-01
Personnel B.L.
Temperature (°F) 74
Humidity (%) 50
Wind Direction Calm
Wind Speed (MPH) Calm
Barometer (in.Hg) 30.17

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made by lifting the front axle with a hydrualic lift on tow bar.
Inspect tow equipment-wrecker interface A safe and adequate connection was made.
Towing Comments A front lift tow was performed incorporating the manufacturer supplied tow bar. No problems were noted with tow or towing interface.
Description and location of any structural damage Note noted.
General Comments None.