Activan

RICON CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 1999-09-03
Personnel B.L.
Temperature (°F) 69
Humidity (%) 58
Wind Direction SW
Wind Speed (MPH) 4
Barometer (in.Hg) 30.01

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed using a wheel under lift.
Description and location of any structural damage Note noted.
General Comments