RENAISSANCE

MOTOR COACH INDUSTRIES Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2000-04-25
Personnel S.C.
Temperature (°F) 59
Humidity (%) 48
Wind Direction W
Wind Speed (MPH) 3-5
Barometer (in.Hg) 29.04

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made.
Inspect tow equipment-wrecker interface A safe and adequate connection was made.
Towing Comments A heavy duty under lift was incorporated to perform a front lift tow.
Description and location of any structural damage None noted
General Comments A front lift tow was performed with no damage or deformation observed and no problems with the towing interface.