MB55

MOLLY CORPORATION Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2002-03-19 Temperature: 65
Personnel: S.C., E.L., T.S. and E.D. Test Load (lbs): 20325
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.029 -0.029 0.007 0.007
2 0.000 0.067 0.067 0.013 0.013
3 0.000 0.197 0.197 0.010 0.010
4 0.000 0.106 0.106 0.011 0.011
5 0.000 0.085 0.085 0.013 0.013
6 0.000 0.331 0.331 0.034 0.034
7 0.000 0.269 0.269 0.032 0.032
8 0.000 0.056 0.056 0.011 0.011
9 0.000 0.075 0.075 0.010 0.010
10 0.000 0.076 0.076 0.011 0.011
11 0.000 0.045 0.045 0.012 0.012
12 0.000 -0.045 -0.045 0.009 0.009

Loading Sequence: 1

Date: 2002-03-19 Temperature: 65
Personnel: S.C., E.L., T.S. and E.D. Test Load (lbs): 20325
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.007 -0.021 -0.028 0.008 0.001
2 0.013 0.069 0.056 0.014 0.001
3 0.010 0.198 0.188 0.010 0.000
4 11.000 0.106 -10.894 0.012 -10.988
5 0.013 0.089 0.076 0.016 0.003
6 0.034 0.335 0.301 0.035 0.001
7 0.032 0.262 0.230 0.032 0.000
8 0.011 0.060 0.049 0.013 0.002
9 0.010 0.076 0.066 0.012 0.002
10 0.011 0.075 0.064 0.011 0.000
11 0.012 0.046 0.034 0.012 0.000
12 0.009 -0.038 -0.047 0.010 0.001