MB55

MOLLY CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2002-07-25
Personnel E.D. and G.M.
Temperature (°F) 68
Humidity (%) 85
Wind Direction nw
Wind Speed (MPH) 4
Barometer (in.Hg) 30.19

Test Results

Inspect tow equipment-bus interface A safe and adequate connection was made between the tow equipment and the bus.
Inspect tow equipment-wrecker interface A safe and adequate connection was made between the tow equipment and the wrecker.
Towing Comments A front lift tow was performed incorporating an hydraulic under lift.
Description and location of any structural damage
General Comments None