Bus/BA

GOSHEN COACH Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 1999-12-10 Temperature: 69
Personnel: B.L., S.C. & E.L. Test Load (lbs): 9000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.048 -0.048 0.002 0.002
2 0.000 0.038 0.038 0.002 0.002
3 0.000 0.077 0.077 0.009 0.009
4 0.000 0.096 0.096 0.005 0.005
5 0.000 0.094 0.094 0.006 0.006
6 0.000 0.085 0.085 0.008 0.008
7 0.000 0.054 0.054 -0.003 -0.003
8 0.000 0.125 0.125 0.013 0.013
9 0.000 0.122 0.122 0.019 0.019
10 0.000 0.104 0.104 0.010 0.010
11 0.000 0.063 0.063 0.006 0.006
12 0.000 -0.060 -0.060 0.002 0.002

Loading Sequence: 1

Date: 1999-12-10 Temperature: 69
Personnel: B.L., S.C. & E.L. Test Load (lbs): 9000
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.002 -0.055 -0.057 0.002 0.000
2 0.002 0.037 0.035 0.002 0.000
3 0.009 0.075 0.066 0.009 0.000
4 0.005 0.095 0.090 0.006 0.001
5 0.006 0.094 0.088 0.006 0.000
6 0.008 0.094 0.086 0.008 0.000
7 -0.003 0.057 0.060 -0.003 0.000
8 0.013 0.135 0.122 0.014 0.001
9 0.019 0.130 0.111 0.020 0.001
10 0.010 0.110 0.100 0.011 0.001
11 0.006 0.067 0.061 0.006 0.000
12 0.002 -0.057 -0.059 0.003 0.001