Structural Shakedown Data Form

Loading Sequence: 1

Date: 2009-10-06 Temperature: 57
Personnel: S.C., E.D., E.L., P.D. & C.S. Test Load (lbs): 27
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.018 -0.018 0.004 0.004
2 0.000 0.127 0.127 0.028 0.028
3 0.000 0.168 0.168 0.031 0.031
4 0.000 0.188 0.188 0.035 0.035
5 0.000 0.176 0.176 0.038 0.038
6 0.000 0.013 0.013 0.005 0.005
7 0.000 -0.004 -0.004 0.000 0.000
8 0.000 0.180 0.180 0.026 0.026
9 0.000 0.221 0.221 0.032 0.032
10 0.000 0.226 0.226 0.030 0.030
11 0.000 0.087 0.087 0.005 0.005
12 0.000 -0.032 -0.032 0.002 0.002

Loading Sequence: 2

Date: 2009-10-07 Temperature: 56
Personnel: E.D., E.L. & P.D. Test Load (lbs): 27
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.004 -0.015 -0.019 0.005 0.001
2 0.028 0.130 0.102 0.030 0.002
3 0.031 0.176 0.145 0.034 0.003
4 0.035 0.194 0.159 0.038 0.003
5 0.038 0.182 0.144 0.039 0.001
6 0.005 0.012 0.007 0.007 0.002
7 0.000 -0.004 -0.004 0.001 0.001
8 0.026 0.177 0.151 0.027 0.001
9 0.032 0.212 0.180 0.035 0.003
10 0.030 0.210 0.180 0.034 0.004
11 0.005 0.109 0.104 0.006 0.001
12 0.002 -0.035 -0.037 0.002 0.000