Dynamic Towing Test Data Form

Date 2009-03-09
Personnel T.S. & S.C.
Temperature (°F) 51
Humidity (%) 75
Wind Direction W
Wind Speed (MPH) 12
Barometer (in.Hg) 30.08

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the towing interface or tow were encountered during testing.</p>