Passport

ELDORADO NATIONAL Pdf Download PDF Report

Structural Shakedown Data Form

Loading Sequence: 1

Date: 2008-03-26 Temperature: 59
Personnel: T.S., S.C., P.D., B.S. & T.W. Test Load (lbs): 18
Reference Point No. A (in) Original Height B (in) Loaded Height B-A (in) Loaded Deflection C (in) Unloaded Height C-A (in) Permanent Deflection
1 0.000 -0.055 -0.055 -0.005 -0.005
2 0.000 0.027 0.027 0.002 0.002
3 0.000 0.058 0.058 0.003 0.003
4 0.000 0.059 0.059 0.002 0.002
5 0.000 0.025 0.025 0.004 0.004
6 0.000 0.529 0.529 0.041 0.041
7 0.000 0.575 0.575 0.054 0.054
8 0.000 0.035 0.035 0.005 0.005
9 0.000 0.043 0.043 0.009 0.009
10 0.000 0.059 0.059 0.004 0.004
11 0.000 0.040 0.040 0.006 0.006
12 0.000 -0.048 -0.048 0.014 0.014