Passport

ELDORADO NATIONAL Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2008-08-27
Personnel T.S.
Temperature (°F) 65
Humidity (%) 52
Wind Direction SSE
Wind Speed (MPH) 7
Barometer (in.Hg) 30.05

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>No damage or deformation was observed.</p>
General Comments <p>No problem with the tow or towinig interface were encountered.</p>