ENTERVAN

BRAUN CORPORATION Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2009-03-31
Personnel T.S. & J.P.
Temperature (°F) 37
Humidity (%) 67
Wind Direction NE
Wind Speed (MPH) 6
Barometer (in.Hg) 30.18

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problem with the tow or towing interface where encountered the test.</p>