2001

Starcraft Automotive Group Pdf Download PDF Report

Unscheduled Maintenance

Date Test Miles Service Activity Downtime Hours
04-15-02 102 Test vehicle bottoming out on the test track Manufacturer request removal of 1 1/2'' lift blocks from the cradle and strut towers and replace with 2 1/2'' blocks. Replaced rear coil springs. Raised the exhaust near the catalytic convertor approximately 1 1/2'' by cutting and welding the exhaust pipe and replaced both upper engine supports. 3.0 3.0