DE40LF

NEW FLYER Pdf Download PDF Report

Dynamic Towing Test Data Form

Date 2009-07-02
Personnel T.S. & S.C.
Temperature (°F) 71
Humidity (%) 57
Wind Direction SW
Wind Speed (MPH) 6
Barometer (in.Hg) 29.8

Test Results

Inspect tow equipment-bus interface <p>A safe and adequate connection was made between the tow equipment and the bus.</p>
Inspect tow equipment-wrecker interface <p>A safe and adequate connection was made between the tow equipment and the wrecker.</p>
Towing Comments <p>A front lift tow was performed incorporating a hydraulic under lift wrecker.</p>
Description and location of any structural damage <p>None noted.</p>
General Comments <p>No problems with the tow or towing interface were encountered.</p>